问题 |
E3S网页汇编
卷积2612021
20217线程能源材料和环境工程国际会议 |
|
---|---|---|
文章号 | 01055 | |
页数 | 4 | |
段内 | 能源开发存储技术研发 | |
多尔市 | https://doi.org/10.1051/e3sconf/202126101055 | |
在线发布 | 2021年5月21日 |
多目标优化分站项目管理研究
商学院上海二大学,中国上海
*对应作者 :wub/sdju.edu.cn
With the rapid development of China's economy, the electricity load continues to increase, the national demand for power engineering projects is also increasing.In the context of the gradual improvement of national requirements for substation projects, decision makers no longer only consider the optimal standards of project duration, cost and quality, but also the resources consumed in the construction and the degree of impact on the environment are important criteria for judging projects.However, in order to be environment-friendly and based on resource constraints, the project management of substation projects is becoming more and more complicated.In this paper, resource factors are added on the basis of the three classical indexes, and the optimal resource allocation of the project is realized under the condition of minimizing the adverse impact on the environment.多目标优化可行性方案通过粒子群优化算法获取
必威西汉姆赞助2021年EDP科学出版
开存文章分发创用CC授权4.0允许在任何介质上不受限制使用、分发和复制,只要原创作品正确引用
当前用法度量显示文章视图累积计数(全文文章视图包括HTML视图、PDF和ePub下载,根据可用数据)和Vision4Press平台摘要视图
数据对应2015年后板状使用当前使用量度自在线发布后48-96小时提供并按周日每日更新
初始下载度量器可能花点时间