预抽出消除技术研究
一号重庆研究院中国煤技术工程集团有限公司
2安徽科技大学华南232001
3天然气灾难监控急救技术国家密钥实验室
*对应作者 :2012156@cqccteg.com
Aiming at the problem of gas control in the working face and the roadway to be excavated at the same time due to the small construction length of bedding borehole under the condition of the occurrence of soft coal, a technology of "one hole and two elimination" pre-drainage to eliminate gas outburst by using air screw motor drilling was put forward, and the field test was carried out in the 17102(3) working face of Pansu Coal Mine.The results show that this technology can effectively control the borehole trajectory, ensure the uniform and reasonable range of borehole outburst elimination, solve the problems of long gas treatment cycle caused by the construction of gas treatment roadway, improve the effective drainage time of borehole, ensure enough time and space for gas treatment, and be beneficial to the mining and replacement of mine.
必威西汉姆赞助2021年EDP科学出版
开存文章分发创用CC授权4.0允许在任何介质上不受限制使用、分发和复制,只要原创作品正确引用
当前用法度量显示文章视图累积计数(全文文章视图包括HTML视图、PDF和ePub下载,根据可用数据)和Vision4Press平台摘要视图
数据对应2015年后板状使用当前使用量度自在线发布后48-96小时提供并按周日每日更新
初始下载度量器可能花点时间